题目
第1题
A.SACCH
B.FCCH
C.SDCCH
D.SCH
E.BCCH
第2题
A.quantization
B.denoising
C.modulation
D.anti-aliasingfiltering
第3题
A.Frequency allocation
B.Space for antennas
C.Electrical power availability
D.Contract with owner
E.Availability of transmission to the BSC
第4题
第5题
第6题
A.Frequency allocation
B.Space for antennas
C.Electrical power availability
D.Permission/Contract with owner
E.Availability of PCM link to the BSC
第7题
A.形状 Shape
B.重量 Weight
C.体积 Volume
D.频率 Frequency
E.密度 Density
第8题
A.形状 Shape
B.重量 Weight
C.体积 Volume
D.频率 Frequency
E.密度 Density
第9题
A.After determining that the frequency or channel appears to be no longer in use
B.After determining that geographic distance from the distress situation will prohibit any other signal from interfering with emergency communications
C.After the Rescue Coordination Center transmits a message on the frequency or channel being used for emergency communications stating that such traffic has concluded
D.Routine communications can resume if,in the Master's opinion,communications on that frequency or channel will not interfere with emergency communications
第10题
A.No action is necessary,as the DSC control unit will automatically switch to the NBDP follow-on communications frequency
B.The operator should immediately set continuous watch on the radiotelephone frequency that is associated with the frequency band on which the distress alert was received
C.The Operator should immediately set continuous watch on VHF channel 70
D.The Operator should immediately set continuous watch on the NBDP frequency that is associated with the frequency band on which the distress alert was received
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!