193Creation of project objectives: A.allows for data collection and analysis and progress

193 Creation of project objectives:

A. allows for data collection and analysis and progress reporting against which standards of performance can be measured.

B. is accomplished by selection of measurable variables against which performance can be judged. C. is required before funding of the project by the project sponsor.

D. all of the above.

E. A and B only

查看参考答案
更多“193Creation of project objectives: A.allows for data collection and analysis and progress”相关的问题

第1题

打开一个已有项目文件的命令是______。A.OPEN PROJECTB.MODIFY PROJECTC.USE PROJECTD.EDIT PROJE

打开一个已有项目文件的命令是______。

A.OPEN PROJECT

B.MODIFY PROJECT

C.USE PROJECT

D.EDIT PROJECT

点击查看答案

第2题

101The lowest dollar amount 'at stake' is associated with the following phase of the proje

101 The lowest dollar amount 'at stake' is associated with the following phase of the project: A. conceptual

B. execution

C. cut-over

D. post project evaluation

E. A and D only

点击查看答案

第3题

183The lowest dollar amount 'at stake' is associated with the following phase of the proje

183 The lowest dollar amount 'at stake' is associated with the following phase of the project: A. conceptual

B. execution

C. cut-over

D. post project evaluation

E. A and D only

点击查看答案

第4题

79Which of the following planning considerations is often overlooked? A.Planning for proje

79 Which of the following planning considerations is often overlooked?

A. Planning for project termination.

B. Qualified project manager assignment.

C. Insuring top management support.

D. Clearly defined tasks.

E. All of the above

点击查看答案

第5题

The project life-cycle can be described as (72).A.project concept, project planning, proje

The project life-cycle can be described as (72).

A.project concept, project planning, project execution, and project close-out

B.project planning, work authorization, and project reporting

C.project planning, project control, project definition, WBS development, and project termination

D.project concept, project execution, and project reporting

点击查看答案

第6题

The schedule risk is the _____ .Athe accumulated "expected' durations which maintain proje

The schedule risk is the _____ .

A the accumulated "expected' durations which maintain project completion.

B Critical Path adjusted by "high-risk" activity float.

C highest risk path that maintains quality.

D Critical Path when calculated with "most likely" duration.

E highest risk path that contributes the most risk toward the project completion.

点击查看答案

第7题

下列关于Proj ECt Controlling模式的表述中,正确的是()。A.Proj ECt Controlling方是业主的决

下列关于Proj ECt Controlling模式的表述中,正确的是()。

A.Proj ECt Controlling方是业主的决策支持机构

B.Proj ECt Controlling模式的核心是以工程的信息流指导和控制工程的物质流

C.业主可以向ProjE Ct Controlling方的具体工作人员下达指令

D.采用Proj ECt Controlling模式时,不再需要建设项目管理咨询单位的信息管理工作

E.ProjE Ct Controlling模式是工程咨询与信息技术相结合的产物

点击查看答案
赏学吧APP
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)
订单号:
遇到问题请联系在线客服
请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注赏学吧 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注赏学吧 -
请用微信扫码测试
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
赏学吧