题目
88 A non-critical path activity is completed in half the time. Then,
A. The critical path is also reduced.
B. The slack in the path containing this activity will increase.
C. The total cost for this activity has decreased.
D. Manpower from this activity can be assigned to other activities.
E. All of the above
第1题
● A non-critical path activity is completed in half the time. Then,
A The critical path is also reduced.
B The slack in the path containing this activity will increase.
C The total cost for this activity has decreased.
D Manpower from this activity can be assigned to other activities.
E All of the above.
第2题
A. Replacing the CAT5 cables with CAT6 cables
B. Replacing traditional racks with water cooled racks
C. Turning off non-critical application servers during non-business hours
D. Taking the second power supply out of non-critical servers
第3题
A. Deploy the service pack to a single department within the corporation.
B. Upgrade the system with requirements for that service pack.
C. Deploy the service pack to a non-critical application server.
D. Submit a change control for the service pack deployment.
第6题
170 A non-critical path activity is completed in half the time. Then,
A. The critical path is also reduced.
B. The slack in the path containing this activity will increase.
C. The total cost for this activity has decreased.
D. Manpower from this activity can be assigned to other activities.
E. All of the above.
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!