Risk Event Status is defined as _____ .
A Risk Probability x Amount At Stake.
B the severity of the consequences.
C how likely the event is to occur with risk.
D (Cost + Benefit + Business Risk) / Insurable Risk.
E B and C
第1题
70 Risk Event Status is defined as _____ .
A. Risk Probability x Amount At Stake.
B. the severity of the consequences.
C. how likely the event is to occur with risk.
D. (Cost + Benefit + Business Risk) / Insurable Risk.
E. B and C
第2题
26 Risk event probability is defined as:
A. the total number of possible events divided into the expectations or frequency of the risk event
B. the number of times the risk event may occur
C. the fraction of the total project tasks which may be affected by the risk event
D. the total number of possible events divided into the consequences of the risk event.
E. A and B
第3题
Risk event probability is defined as:
A the total number of possible events divided into the expectations or frequency of the risk event
B the number of times the risk event may occur
C the fraction of the total project tasks which may be affected by the risk event
D the total number of possible events divided into the consequences of the risk event.
E A and B
第4题
144 Risk event probability is defined as:
A. the total number of possible events divided into the expectations or frequency of the risk event
B. the number of times the risk event may occur
C. the fraction of the total project tasks which may be affected by the risk event
D. the total number of possible events divided into the consequences of the risk event.
E. A and B
第5题
A.Continue to search for an insurance company that would assume the risk
B.Place special emphasis on the risk event to intensely manage that item and all interfacing items
C.Play down the risk and the team will find a means of overcoming any failure
D.Ignore the risk assessment because any assigned value is a point estimate which is never precisely the expected state of nature
第6题
4 Total Project Risk:
A. should not be calculated for small projects
B. is the probability of each project risk event times the sum of the consequences of individual project risk events which could occur during the project.
C. Is the cumulative sum of the probability of each individual project risk event times the consequences of occurrence of that risk event.
D. A and B
E. A and C
第7题
122 Total Project Risk:
A. should not be calculated for small projects
B. is the probability of each project risk event times the sum of the consequences of individual project risk events which could occur during the project.
C. Is the cumulative sum of the probability of each individual project risk event times the consequences of occurrence of that risk event.
D. A and B
E. A and C
第8题
A.If the bank can demonstrate that its specific risk modeling captures all aspects of specific risk, a surcharge will not be required.
B.If a bank’s model captures the idiosyncratic variation in its debt and equity portfolios, but does not measure default and event risk, a model calculated surcharge should be added to the capital charge.
C.Specific risk includes default and event risk but not idiosyncratic variation.
D.If a bank’smodel does notmeasure specific risk, the surcharge for specific risk should be 100% of the standardized specific risk charge.