题目
(74)
A.Ahead of schedule
B.Behind schedule
C.On schedule
D.Having not enough information provided
第2题
A.don't you
B.aren't you
C.are you
第3题
第5题
You'd better______ advice before making a project plan.
A.put down
B.take in
C.turn out
D.ask for
第6题
A.object
B.reject
C.inject
D.project
第7题
Hi Bob, I'd like to congratulate you on the progress of Beihai project.()
A. Fine, thank you. It is really an interesting project
B. Thank you, John. It is really an interesting project
C. My pleasure, It is really an interesting project
第8题
163 During a project review meeting, you discover that your $250,000 project has a negative schedule variance of $20,000 which equates to 12% of the work scheduled to this point of time. You can therefore conclude that:
A. The project will be completed late.
B. The critical path has been lengthened.
C. the costs are being overrun.
D. Overtime will be required to maintain the original critical path.
E. None of the above.
第9题
81 During a project review meeting, you discover that your $250,000 project has a negative schedule variance of $20,000 which equates to 12% of the work scheduled to this point of time. You can therefore conclude that:
A. The project will be completed late.
B. The critical path has been lengthened.
C. the costs are being overrun.
D. Overtime will be required to maintain the original critical path.
E. None of the above
第10题
A.Ahead of schedule
B.Behind schedule
C.On schedule
D.Having not enough information provided
第11题
A.design
B.to design
C.designed
D.designing