题目
146 The work breakdown structure (WBS) is an excellent tool for objective control and evaluation. Which of the following is generally NOT validated through the WBS?
A. Time, schedule and cost.
B. Management coordination and organization structuring.
C. Work methods and accountability.
D. Quality of work.
E. Risk and impact decision-making
第1题
146 The critical path in a network is the path that:
A. Has the greatest degree of risk.
B. Will elongate the project if the activities on this path take longer than anticipated.
C. Must be completed before all other paths.
D. All of the above.
E. A and B only
第2题
146 The planned cost for the total project at its inception is called the _____.
A. Cost of goods sold.
B. Depreciable value.
C. Budgeted cost.
D. All of the above.
E. B and C only
第3题
146 The five major cost categories of quality are _____ .
A. prevention, appraisal, internal failures, external failures, and equipment (measurement and test). B. specifications, QA programs, QC programs, parts rejected and parts returned
C. Staffing, Training, reviews, equipment and rejected goods
D. sampling, design considerations, manufacturing considerations, training and rework.
E. None of the above
第5题
I' m a deputy manager. I()an IT company.
A. work for
B. work about
C. work
第7题
Either he or I ______ in the lab next week.
A.were to work B.ain to work
C.has to work D.is to work
第8题
A.work of a day
B.a day’s work
C.day's work
D.a-day work
第9题
A.work with brains
B.work with hands
C.the work that people do at home
D.the work scientists do in the lab
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!