题目
The document authorizing functional areas to charge against the project is the:
A. Work authorization form
B. Scope baseline
C. Project charter
D. Management plan
E .Linear responsibility chart
第1题
Scope management is:
A.a project control function.
B.employs change control.
C.a work authorization process.
D.considers Cost, Quality and Schedule.
E.All of the above.
第2题
__________ 查看材料
A.And how about website authoring skills?
B.I think I have all the information I need!
C.I" m afraid I"ve never used those CGI things.
D.First of all, tell me about yourself.
第5题
(1)Any document bears an apparently ______of the issuer of the document.
(2)Document appears to be written, typed, perforated or stamped by the ______.
(3)Document appears to be on the ______.
(4) Document states that it is ______.
第7题
A.The document will win support from the delegates.
B.The document will be completed after the conference
C.The document will cover the next two decades.
D.The document will serve as a guidelin
E.
第8题
A.RPC/literal
B.RPC/encoded
C.Document/encoded
D.Document/literal
E.Document/literalwrapped
第9题
The bill of lading is the main document used in shipping.()
第10题
What document presented under an L/C is treated as original?
(1)( ) A statement in a document that another document is the sole original.
(2)( ) If the document
1) appears to be written, typed, perforated, or stamped by the document issuer hand, or
2) appears to be on the document issuer original stationery, or
3) appears to be hand-signed by the document issuer, or
4) appears to bear the document issuer facsimile signature, or
5) appears to be a photocopy of another document if such photocopy appears to have been completed by the document issuer hand marking.
6) If a document states that it is original or marks/stamps the word "original".