题目
A.Cross-connect clock main control board
B.GE optical interface board
C.XGE optical interface board
D.FE electrical interface board
第1题
B.The 1U equipment supports two installation modes: installation on the 19” standard rack (ETSI compatible) and desktop installation. The 6U equipment supports the installation on the 19” standard rack.
C.All optical interfaces on the ZXMP 600 are SC connectors.
D.The 6U CWE cabinet supports the -48V/-60V (1+1 hot backup and dual input) power input.
第2题
A、1+N backup
B、Facility backup
C、1+1 backup
D、one to one backup
第3题
A. Hot site
B. Warm site
C. Cold site
D. Active failover site
第4题
A.Init
B.Idle
C.Active
D.Standby
E.Established
F.Backup
第5题
A.Standby
B.Established
C.Active
D.Idle
E.Backup
F.Init
第6题
A.root
B.designated
C.alternate
D.backup
E.forwarding
F.learning
第7题
A.tar -xvf /mnt/backup/server1.mksysb ./etc/resolv.conf
B.restore -Tvf /mnt/backup/server1.mksysb ./etc/resolv.conf
C.listvgbackup -f /mnt/backup/server1.mksysb -r ./etc/resolv.conf
D.restorevgfiles -xrm /mnt/backup/server1.mksysb ./etc/resolv.conf
第9题
A. Run the following command: ntbackup.exe backup /F {"FileName"}
B. Run the following command: ntbackup.exe backup systemstate /F {"FileName"}
C. In Control Panel, open System, and configure the Startup and Recovery settings on the Advanced tab.
D. Use NTBackup interactively.
第10题
A. Run the following command: ntbackup.exe backup /F {"FileName"}
B. Run the following command: ntbackup.exe backup systemstate /F {"FileName"}
C. In Control Panel, open System, and configure the Startup and Recovery settings on the Advanced tab.
D. Use NTBackup interactively.
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!