题目
A.drawings
B.manuals
C.instructions
D.conditions
第2题
A.after
B.for
C.with
D.before
第3题
A. qualifications
B. preparations
C. movements
D. basements
第4题
What will Israel do with the barrier?
A.It will stop building the barrier.
B.It will suspend building the barrier.
C.It will continue building the barrier.
D.It will resume building the barrier.
第5题
A.The surveyor’s comment was not correct; because the Life-raft has the Hydra-Static Releaser, should not care the height of Storing Position
B.The surveyor’s comment was correct; because if the Storing height was over the Limit of the Life-raft, It may damage the Life-raft when throwing off to the water
C.The surveyor’s comment was not correct; the storing position was the same location as showing on the approved drawings
D.The surveyor’s comment was correct; as a surveyor, he can give any comment as he like
第6题
阅读下面短文,掌握其大意,然后从21~30各题所给的A、B、C和D项中,选出最佳选项,
Alfred Nobel became a millionaire and changed the ways of mining,construction,and warfare as the inventor of dynamite(炸药). On April 12,1888,Alfred's brother Ludwig died of heart attack. A major French newspaper _21_ his brother for him and carried an article _22_ the death of Alfred Nobel. “The merchant of death is dead.” The article read. “Dr. Alfred
Nobel,who became _23_ by finding ways to kill more people faster than ever before,died yesterday. ”Nobel was _24_ to find out not that he had died,but that,when his time was up, he would be thought of only as one who profited from _25_ and destruction.
To make sure that he was _26_ with love and respect. Nobel arranged in his _27_ to give the largest part of his money to _28_ the Nobel prizes,which would be awarded to people who made great _29_ to the causes of peace,literature,and the sciences. So _30_ ,Nobel had to die before he realized what his life was really about.
21. A. found B. misunderstood C. mistook D. judged
第7题
Announcement from China ABC Tender Corporation
Dear Sirs/Madam,
In accordance with the Loan Agreement between Chinese Government and the Asian Development Bank (ADB) for "The Construction of a New Harbor Project in Shandong", China ABC Corporation Shandong Branch now invites bids from eligible suppliers from member countries of ADB for "the Construction of a New Harbor" in Shandong, to be financed with the proceeds of ADB.
All those who are willing to participate in the bid are kindly requested to contact our office at 60 Yan'an Road, Qingdao, Shandong, tel86-532-6168217 , fax 86-532-6168218 to obtain bidding document between 9: 00 a.m.and 11: 00 a.m.(Sundays and holidays excepted)from Oct.25, 2008 to Dec.25, 2008 upon nonrefundable payment of RMB 500 while express mail postage RMB 50 shall be added.
Bids shall reach ABC Corporation before 5: 00 a.m.Jan.1, 2009 (local time).Bids will be opened in public at 10: 00 a.m.on Jan.18th, 2009(local time) in China ABC Corporation.Bids received after that date and time or not accompanied by a Bid Bond USD $1200 as required in the bidding document will not be accepted.
Yours truly,
Bids will be opened in Rm.A0408 at the address below:
China ABC Corporation Shandong Branch
Hui Bin Office Building, No.60 Yanan Road
Qingdao, Shandong, China
P.O.Box: 9802
Post code: 100101
Telex: 22655 CPCCI CN
Tel: 4916649, 4916650
Fax: 4216612
第8题
B: Sure.We are inviting tender for the construction of a thermal power plant.We already got more than ten tenders from various countries.
A: We learnt that this project is very competitive.When do you start to the bid?
B: The end before this month.Tenders received after the deadline will not be considered.If you are interested in this tender, you can have a set of tender documents and get the details of the requirements.
A: What should we prepare if we would like to take part in the bid?
B: First, you're required to get the bid documents against payment RMB 500 yuan.The document should be designated department with in designated time.
A: Shall we pay tender bond?
B: Yes.If you fail to furnish a tender bond before the opening of the tender, your tender will not be considered.And detailed engineering of the works, technical specifications and other tender documents should precede the invitation to tender for the contract.
A: I see.
B: It's well known that your company has great experience in this field.We hope you will consider this tender invitation carefully.
A: I think we will.
第9题
材料:
A Passenger Ship Safety Certificate shall be issued for a period not exceeding 12 months.A Cargo Ship Safety Construction Certificate,Cargo Ship Safety Equipment Certificate and Cargo Ship Safety Radio Certificate shall be issued for a period specified by the Administration which shall not exceed five years.
An Exemption Certificate shall not be valid for longer than the period of the certificate to which it refers.
(i)When the renewal survey is completed within three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:
(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;
(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;
(ii)When the renewal survey is completed after the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:
(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;
(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;
(iii)when the renewal survey is completed more than three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:
(1)for a passenger ship,a date not exceeding 12 months from the date of completion of the renewal survey;
(2)for a cargo ship,a date not exceeding five years from the date of completion of the renewal survey.
问题:
The valid period of an Exemption Certificate for Cargo Ship Safety Equipment Certificate shall be ________.
A.longer than five years
B.shorter than five years
C.longer than 12 months
D.shorter than 12 months
When the renewal survey is completed within one month before the expiry date of the existing Cargo Ship Safety Construction Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificate
B.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificate
C.from the date of expiry of the existing certificate to a date not exceeding 12 months from the date
D.from the date of expiry of the existing certificate to a date not exceeding five years from the date
It can be concluded that the actual period of validity of a new Passenger Ship Safety Certificate is less than 12 months if the renewal survey is completed ________.A.4 months before its expiry date
B.3 months before its expiry date
C.2 months before its expiry date
D.after its expiry date
When the renewal survey is completed on a date which is 99 days before the expiry date of the existing Cargo Ship Safety Radio Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificate
B.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificate
C.from the date of expiry of the existing certificate to a date not exceeding 12 months from the date
D.from the date of completion of the renewal survey to a date not exceeding five years from that date
请帮忙给出每个问题的正确答案和分析,谢谢!
第10题
What is the best title for this passage?
A.The Future of Transportation
B.Argonne Develops Maglev Train
C.The Disadvantages of Commuting by Airplane
D.Commuting in the Future
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!