重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
当前位置: 首页 > 大学 > 大学专科 > 法律事务类 > 经济法
网友您好, 请在下方输入框内输入要搜索的题目:
搜题

题目

[单选题]

Before construction or manufacture can begin, it is necessary to have complete assemb

A.drawings

B.manuals

C.instructions

D.conditions

单选题,请选择你认为正确的答案:
提交
你的答案:
错误
正确
查看参考答案
更多“Before construction or manufacture can begin, it is necessary to have complete assemb”相关的问题

第1题

If the builder breaches a construction contract either before or during construction,
点击查看答案

第2题

The bridge was named_____ the hero who had given his life for the construction of it()

A.after

B.for

C.with

D.before

点击查看答案

第3题

The () are much stricter than before to ensure passenger safety, so the construction work for Titanic II must meet current regulations.

A. qualifications

B. preparations

C. movements

D. basements

点击查看答案

第4题

听力原文: Israeli Prime Minister Ariel Sharon has ordered construction to continue on Isra
el's West Bank separation barrier despite a non-binding world court ruling declaring the barrier illegal. The Sharon order comes fortyeight hours after the International Court of Justice ruled the illegal barrier should be dismantled. Hours before Mr. Sharon's order today, Palestinian militants detonated a bomb near a Tel Aviv bus station that killed an Israeli soldier and wounded more than twenty other people.

What will Israel do with the barrier?

A.It will stop building the barrier.

B.It will suspend building the barrier.

C.It will continue building the barrier.

D.It will resume building the barrier.

点击查看答案

第5题

One Class Surveyor got onboard of a 45000 DWT new construction Chemical Tanker a week before delivery, he carried out the initial Safety Equipment survey in accordance with the Fire Fighting and Life-

A.The surveyor’s comment was not correct; because the Life-raft has the Hydra-Static Releaser, should not care the height of Storing Position

B.The surveyor’s comment was correct; because if the Storing height was over the Limit of the Life-raft, It may damage the Life-raft when throwing off to the water

C.The surveyor’s comment was not correct; the storing position was the same location as showing on the approved drawings

D.The surveyor’s comment was correct; as a surveyor, he can give any comment as he like

点击查看答案

第6题

ca1888

阅读下面短文,掌握其大意,然后从21~30各题所给的A、B、C和D项中,选出最佳选项,

Alfred Nobel became a millionaire and changed the ways of mining,construction,and warfare as the inventor of dynamite(炸药). On April 12,1888,Alfred's brother Ludwig died of heart attack. A major French newspaper _21_ his brother for him and carried an article _22_ the death of Alfred Nobel. “The merchant of death is dead.” The article read. “Dr. Alfred

Nobel,who became _23_ by finding ways to kill more people faster than ever before,died yesterday. ”Nobel was _24_ to find out not that he had died,but that,when his time was up, he would be thought of only as one who profited from _25_ and destruction.

To make sure that he was _26_ with love and respect. Nobel arranged in his _27_ to give the largest part of his money to _28_ the Nobel prizes,which would be awarded to people who made great _29_ to the causes of peace,literature,and the sciences. So _30_ ,Nobel had to die before he realized what his life was really about.

21. A. found B. misunderstood C. mistook D. judged

点击查看答案

第7题

Announcement from China ABC Tender Corporation Dear Sirs/Madam, In accordance with the Loan Agre

Announcement from China ABC Tender Corporation

Dear Sirs/Madam,

In accordance with the Loan Agreement between Chinese Government and the Asian Development Bank (ADB) for "The Construction of a New Harbor Project in Shandong", China ABC Corporation Shandong Branch now invites bids from eligible suppliers from member countries of ADB for "the Construction of a New Harbor" in Shandong, to be financed with the proceeds of ADB.

All those who are willing to participate in the bid are kindly requested to contact our office at 60 Yan'an Road, Qingdao, Shandong, tel86-532-6168217 , fax 86-532-6168218 to obtain bidding document between 9: 00 a.m.and 11: 00 a.m.(Sundays and holidays excepted)from Oct.25, 2008 to Dec.25, 2008 upon nonrefundable payment of RMB 500 while express mail postage RMB 50 shall be added.

Bids shall reach ABC Corporation before 5: 00 a.m.Jan.1, 2009 (local time).Bids will be opened in public at 10: 00 a.m.on Jan.18th, 2009(local time) in China ABC Corporation.Bids received after that date and time or not accompanied by a Bid Bond USD $1200 as required in the bidding document will not be accepted.

Yours truly,

Bids will be opened in Rm.A0408 at the address below:

China ABC Corporation Shandong Branch

Hui Bin Office Building, No.60 Yanan Road

Qingdao, Shandong, China

P.O.Box: 9802

Post code: 100101

Telex: 22655 CPCCI CN

Tel: 4916649, 4916650

Fax: 4216612

点击查看答案

第8题

A: Good morning.I am Peter from ABC Building company.We noted your tender advertisement and I am her
e to inquire about the tender.Would you like to tell me something about it in detail?

B: Sure.We are inviting tender for the construction of a thermal power plant.We already got more than ten tenders from various countries.

A: We learnt that this project is very competitive.When do you start to the bid?

B: The end before this month.Tenders received after the deadline will not be considered.If you are interested in this tender, you can have a set of tender documents and get the details of the requirements.

A: What should we prepare if we would like to take part in the bid?

B: First, you're required to get the bid documents against payment RMB 500 yuan.The document should be designated department with in designated time.

A: Shall we pay tender bond?

B: Yes.If you fail to furnish a tender bond before the opening of the tender, your tender will not be considered.And detailed engineering of the works, technical specifications and other tender documents should precede the invitation to tender for the contract.

A: I see.

B: It's well known that your company has great experience in this field.We hope you will consider this tender invitation carefully.

A: I think we will.

点击查看答案

第9题

材料:A Passenger Ship Safety Certificate shall be issued for a period not exceeding 12 mon

材料:

A Passenger Ship Safety Certificate shall be issued for a period not exceeding 12 months.A Cargo Ship Safety Construction Certificate,Cargo Ship Safety Equipment Certificate and Cargo Ship Safety Radio Certificate shall be issued for a period specified by the Administration which shall not exceed five years.

An Exemption Certificate shall not be valid for longer than the period of the certificate to which it refers.

(i)When the renewal survey is completed within three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:

(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;

(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;

(ii)When the renewal survey is completed after the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:

(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;

(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;

(iii)when the renewal survey is completed more than three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:

(1)for a passenger ship,a date not exceeding 12 months from the date of completion of the renewal survey;

(2)for a cargo ship,a date not exceeding five years from the date of completion of the renewal survey.

问题:

The valid period of an Exemption Certificate for Cargo Ship Safety Equipment Certificate shall be ________.

A.longer than five years

B.shorter than five years

C.longer than 12 months

D.shorter than 12 months

When the renewal survey is completed within one month before the expiry date of the existing Cargo Ship Safety Construction Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificate

B.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificate

C.from the date of expiry of the existing certificate to a date not exceeding 12 months from the date

D.from the date of expiry of the existing certificate to a date not exceeding five years from the date

It can be concluded that the actual period of validity of a new Passenger Ship Safety Certificate is less than 12 months if the renewal survey is completed ________.A.4 months before its expiry date

B.3 months before its expiry date

C.2 months before its expiry date

D.after its expiry date

When the renewal survey is completed on a date which is 99 days before the expiry date of the existing Cargo Ship Safety Radio Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificate

B.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificate

C.from the date of expiry of the existing certificate to a date not exceeding 12 months from the date

D.from the date of completion of the renewal survey to a date not exceeding five years from that date

请帮忙给出每个问题的正确答案和分析,谢谢!

点击查看答案

第10题

The next decade could see commuters speeding to work at about 300 miles per hour aboard ma
gnetic levitation vehicles, according to a report by Argonne National Laboratories. But before "maglev" vehicles can become commercial successes, the report says, people need to stop thinking of them as high-speed trains. Instead, consider them low-flying aircraft. Argonne contends that maglev vehicles will be best suited to replace commuter aircraft. Plane flights under 600 miles are the least energy-efficient, and maglev "planes" should cut these fuel needs by up to 75 percent. Reportedly, the money saved by a 2,000-mile maglev network linking major cities world more than pay for its construction in 20 years. The quiet purr of levitating crafts would also be a balm for neighborhoods tormented by the roar of conventional takeoffs and landings. The technology behind magnetic levitation is already well understood, the report notes. The West Germans and the Japanese already well understood, the report notes. The West Germans and the Japanese have several full-scale working models. Meanwhile, research in the United States has lapsed.

What is the best title for this passage?

A.The Future of Transportation

B.Argonne Develops Maglev Train

C.The Disadvantages of Commuting by Airplane

D.Commuting in the Future

点击查看答案
赏学吧APP
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)
订单号:
遇到问题请联系在线客服
请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注赏学吧 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注赏学吧 -
请用微信扫码测试
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
赏学吧