题目
A. stress
B. press
C. depress
D.distress
第1题
Your vessel has lifeboats on both sides. Lifeboat No. 2 is located ________.
A.forward of lifeboat No. 4 on the starboard side
B.forward of lifeboat No. 4 on the port side
C.aft of lifeboat No. 1 on the starboard side
D.All of the above
第2题
Frapping lines ______.
A.secure the lifeboat in the davits when in the stowed position
B.bring the lifeboat close alongside the rail in the embarkation position
C.give the occupants a safety line when the boat is being lowered from the embarkation level
D.reduce the swinging of the lifeboat at the embarkation level
第3题
The control lever for the mechanical disengaging apparatus in a lifeboat shall ______.
A.be painted bright red
B.be secured to a permanent part of the lifeboat structure
C.have the area surrounding the lever painted white
D.All of the above
第4题
The steering oar in a lifeboat is usually referred to as the ______.
A.bumpkin oar
B.stroke oar
C.sweep oar
D.becket oar
第5题
The length of the steering oar in a lifeboat is ______.
A.shorter than the rowing oars
B.the same length as the rowing oars
C.longer than the rowing oars
D.unrelated to the length of the rowing oars
第6题
The engine in a covered lifeboat is fueled with ______.
A.Kerosene
B.Unleaded gasoline
C.Diesel oil
D.Liquefied gas
第7题
A certificated lifeboatman assigned to command the lifeboat must ______.
A.be the first individual to board the craft
B.drain the hydraulic pressure before lowering the craft
C.have a list of the persons assigned to the liftboat
D.all of the above
第8题
Frapping lines are fitted to lifeboat davits to ______.
A.secure the lifeboat in the davits when in the stowed position
B.bring the life boat close along the rail in the embarkation position
C.give the occupants a safety line when the boat is being lowered from the embarkation level
D.reduce the swinging of the lifeboat at the embarkation level
第9题
A.International orange
B.Yellow
C.White
D.Red
第10题
In launching a lifeboat, when should the tricing pendants be released?______.
A.Before the boat is lowered from the stowage position
B.As soon as the boat-fall blocks clear the davit head
C.After the limit switch is activated
D.After all people have been embarked
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!