重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
当前位置: 首页 > 其他 > 其他
网友您好, 请在下方输入框内输入要搜索的题目:
搜题

题目

[主观题]

The bridge in that village ________,when we passed.

A.was being repaired

B.is being repaired

C.had been repaire

D.have been repaired

查看参考答案
更多“The bridge in that village ________,when we passed.”相关的问题

第1题

In the Ezonexam switched LAN environment, what does the IEEE 802.1Q standard describe?A. V

In the Ezonexam switched LAN environment, what does the IEEE 802.1Q standard describe?

A. VLAN pruning

B. A method of VLAN trunking

C. An approach to wireless LAN communication

D. The operation of VTP

E. The process for root bridge selection

F. None of the above

点击查看答案

第2题

材料:Pride of Le Havre is a 33,336 gross tonnage passenger/ro-ro cargo vessel operating a

材料:

Pride of Le Havre is a 33,336 gross tonnage passenger/ro-ro cargo vessel operating a regular ferry service between Portsmouth and Le Havre.The vessel is fitted with bow and stern doors and is capable of carrying 590 cars and 1600 passengers.Propulsion is by four diesel engines driving through two controllable pitch propellers.Two transverse thrust units are fitted forward.

The vessel had sailed from A&P&39;s King George V dry dock,Southampton,just after midnight on Thursday 18 March,for engine trials.The intention was that after these trials,Pride of Le Havre would berth at Portsmouth,and re-enter service later that day.

Shortly after passing the Nab Tower,the bridge fire alarm activated at 0425,indicating a fire in the machinery spaces.At about the same time,a motorman reported to the engineer watchkeeper that a fire had broken out on the starboard thermal oil pump.While initial attempts were being made to put the fire out using portable extinguishers,the chief engineer was called and the bridge informed of the situation.On confirming that the initial attempt had failed,the chief engineer advised the bridge that he proposed to use the Halon total flooding extinguishing system.The general alarm was sounded and the main engines stopped. The engine room was evacuated and sealed,with Halon being released at 0437.The coastguard and owners were told of the situation with a message being broadcast to local shipping.

A fire brigade team boarded at 0641 with re-entry to machinery space at 0958.Funnel vents were re-opened at 1030 with a fire extinguishing foam blanket laid down in the main machinery space.Ventilation of the engine room started at 1210 with full electrical power available by 1330.Under the direction of the chief engineer,the engine room crew started systematically checking and preparing machinery until,at 1750,No 4 main engine was started followed shortly afterwards by No 1 main engine.

Pride of Le Havre sailed under her own power back to Southampton where she re-entered the dry dock berth to undergo examination and repair.She was all fast alongside at 0033 on Friday 19 March 1999.

问题:

Pride of Le Havre is equipped with ________.

A.4 transverse thrust units,2 propellers,2 engines and 2 vehicle doors

B.2 transverse thrust units,2 propellers,2 engines and 1 vehicle door

C.2 transverse thrust units,1 propeller,2 engines and 2 vehicle doors

D.2 transverse thrust units,2 propellers,4 engines and 2 vehicle doors

The fire was put out by ________.A.a fire brigade team

B.the coastguard

C.owners

D.the crew

Should she have not been on fire,Pride of Le Havre would have re-entered the service on ________.A.Friday

B.Thursday

C.19 March

D.any day after 18 March

The using of the Halon total flooding extinguishing system was initially suggested by ________.A.the engineer watchkeeper

B.a motorman

C.the coastguard and owners

D.the chief engineer

请帮忙给出每个问题的正确答案和分析,谢谢!

点击查看答案

第3题

Which one is the longest cross-sea bridge in the world?()

A、It is the Golden Gate Bridge

B、It is the London Bridge

C、It is the Hong Kong-Zhuhai-Macao Bridge

点击查看答案

第4题

They are building a bridge () the river.

A.through

B.across

C.on

点击查看答案

第5题

The George Washington Bridge is a double-deck bridge across _____ Hudson River .A.a

The George Washington Bridge is a double-deck bridge across _____ Hudson River .

A.a

B.an

C.the

D./

点击查看答案

第6题

When ice forms on the bridge, c______ work has toWhen ice forms on the bridge, c______ work has to be stopped.
点击查看答案

第7题

There () a bridge across the river.A、standsB、standing

There () a bridge across the river.

A、stands

B、standing

点击查看答案

第8题

bridge clearance
点击查看答案

第9题

They are building a bridge () the river.

点击查看答案

第10题

The bridge is ________ construction.A、inB、withC、underD、during

The bridge is ________ construction.

A、in

B、with

C、under

D、during

点击查看答案
赏学吧APP
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)
订单号:
遇到问题请联系在线客服
请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注赏学吧 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注赏学吧 -
请用微信扫码测试
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
赏学吧