题目
Freight rates are mostly charged________.
A.by the weight(tons)of cargo
B.by the capacity(tons)of vessel
C.by DW of the vessel
D.by the draft of the vessel
第1题
Ocean freight rates may be broadly divided into container rates and liner freight rates.( )
第2题
The main advantages of the conference system to shippers are( ).
A. stability of freight rates B. regularity of the services
C. flexible procedures D. high rates
第3题
Liner freight rates remain comparatively steady over a period of time.( )
第4题
A.Class Rates
B.Specific Commodity Rates
C.Minimum Charges
D.General Cargo Rates
第5题
此题为判断题(对,错)。
第6题
B.Specific Commodity Rate
C.Commodity Classification Rate
D.Freight All Kinds Rate
第7题
B.Specific Commodity Rate
C.Commodity Classification Rate
D.Freight All Kinds Rate
第8题
In 1975 water transport accounted for 22.6 per cent of total inter-city tonnage. Its relative share of inter-city tonnage was 31.3 per cent in 1947 and 31.7 per cent in 1958. Tonnage declined to 27.9 per cent in 1965 but increased by 1970 to 28.4 per cent. This short- term increase did not stabilize. Market share dropped by 5.8 per cent by 1975. Forecasted market share by 1985 is 18.4 per cent of total inter-city tonnage. The water transport share of revenue has been less than 2 per cent of inter-city freight revenue since 1955.
The exact miles of improved waterways in operation depend in part on whether coast- wise and inter-coastal shipping are included. Approximately 26,000 miles of improved inland waterways were operated in 1975. Fewer miles of improved inland waterways exist than of any other transportation mode.
The main advantage of water transport is the capacity to move extremely large shipments. Deep-water vessels are restricted in operation, but diesel-towed barges have a fair degree of flexibility, in comparison to rail and highway, water transport ranks in the middle with respect to fixed cost. The fixed cost of operation is greater than that of motor carriers but less than that of railroads. The main disadvantage of water is the limited degree of flexibility and the low speeds of transport. Unless the source and destination of movement are adjacent to a waterway, supplemental haul by rail or truck is required. The capability of water to transport large tonnage at low variable cost places this mode of transport in demand when low freight rates are desired and speed of transit is a secondary consideration.
Freight transported by inland water leans heavily to mining and basic bulk commodities, such as chemicals, cement, and selected agricultural products. In addition to the restrictions of navigable waterways, terminal facilities for bulk and dry cargo storage and load-unload devices limit the flexibility of water transport. Labor restrictions on loading and unloading at dock level create operational problems and tend to reduce the potential range of available traffic. Finally, a highly competitive situation has developed between railroads and inland water carriers in areas where parallel routings exist.
Inland and Great Lakes water transport will continue to be a viable alternative for future logistical system design. The full potential of the St. Lawrence Seaway has not yet been realized with respect to domestic freight. The slow passage of inland river transport can provide a form. of warehousing in transit if fully integrated into overall system design. Improvements in ice-breaking equipment appear on the verge of eliminating the seasonal limitations of water transport.
Why it is difficult to say exactly how many miles of improved waterways are in operation?
A.The most recent figure is for 1975 and the figure is declining.
B.Water transport's market share goes up and down frequently.
C.So few miles of inland waterways exist that no one has bothered to count them.
D.You must know whether to include coastwise and inter-coastal shipping in the figure.
第9题
根据已知资料改正下列单据中错误的地方
1.信用证资料
Form of Doc. Credit*40A :IRREVOCABLE
Doc. CreditNumber*20 :LC-320-0254771
Date of Issue 31C :060922
Expiry*31D :Date061222 Place
Applicant*50 :MARCONOCORPORATION
RM1001 , STARBLDG. TOLYO.JAPAN
Beneficiary*59 :QINGDAO(SHANDONG)HUARUI CO.
NO.35 WUYI ROAD QINFDAO,
Amount*32B :CurrencyUSD Amount 70000.00
Pos./Neg.Tol.(%) 39A :5/5
Availablewith/by*41D :ANY BANK
BY NEGOTIATION
Draft at… 42C :DRAFTS AT SIGHT FOR FULL INVOICE
VALUE
Drawee 42A :ROYALBANK LTD.TOLYO
Partialshipments 43P :ALLOWED
Transshipment 43T :NOT ALLOWED
Loading inCharge 44A :SHIPMENT FROM CHINESE MAIN PORT
For Transportto 44B :OSAKA,
Latest Date ofShip. 44C :061210
Descript. ofGoods 45A :
HALF DRIED PRUNE 2005CROP
GRADE SPEC QNTY UNIT PRICE
(CASE) (USD/CASE)
A L:500CASE M:500CASE 1,000 22.0 CFR OSAKA
B L:1200CASE M:1200CASE 2400 22.0 FER OSAKA
PACKING: IN WOODEN CASE,12KGS PERCASE
TRADE TERMS:CFR OSAKA
Documents required 46A:
FULL SET OF CLEAN ON BOARD OCEANBILLS OF LADING MADE OUT
TO ORDER OF SHIPPER AND BLANKENDORSED AND MARKED
“FREIGHT PREPAID”AND “NOTIFYMARCONO CORPORATION.RM1001.
STAR BLDGTOKYO,
﹢MANUALLY SIGNED COMMERCIAL INVOICE IN TRIPLICATE(3)
INDICATING APPPLICANT’S REF. NO.SCLI-98-0474.
﹢PACKING LIST IN TRIPLICATE(3).
Details ofCharges 71B :ALL BANKING CHARGES OUTSIDE
ACCOUNT OF BENEFICIARY
PresentationPeriod 48 :DOCUMENTS TO BE PRESENTED WITHIN 15 DAYS
AFTER THE DATEOF SHIPMENT,BUT WITHIN THE
VALIDITY OF THECREDIT.
2.补充资料
发票号码:76IN-C001, 发票日期:2006年9月8日
提单号码:NSD220055, 提单日期:2006年12月5日
船名:FENGLEI V.66026H 装运港:青岛港
集装箱:2×20'FCL CY/CY 出口口岸:青岛海关
TRIU 1764332 SEAL05003 合同号:HA1101
KHLU1766888 SEAL 05004 SHIPPING MARKS(唛头)
出口商:青岛华瑞贸易公司 MO
净重:12.00KGS/CASE HA1101
毛重:14.00KGS/CASE OSAKA
尺码:(20×10×10)CM/CASE NOS1-3400
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!