题目
A.Implement
B.Design
C.Prepare
D.Operate
第1题
A.The integration phase
B.The design phase
C.The implementation phase
D.The maintenance phase
第2题
(68) A.development phase
B.engineering phase
C.maintenance phase
D.Definition phase
第3题
Which phase of the software development requires the most development time?
A.the design phase
B.the testing phase
C.the maintenance phase
D.the development phase
第4题
A.Prepare
B.Plan
C.Design
D.Operate
第5题
A.definition phase
B.engineering phase
C.maintenance phase
D.development phase
第6题
94 The definitive terms of a contract are written during which of the following contract phases? A. Contract Phase
B. Post-Award Phase
C. Award Phase
D. Pre-Award Phase
E. Requirement Phase
第7题
176 The definitive terms of a contract are written during which of the following contract phases? A. Contract Phase
B. Post-Award Phase
C. Award Phase
D. Pre-Award Phase
E. Requirement Phase
第8题
A.Prepare
B.Plan
C.Design
D.Operate
第9题
6 Typically, during which phase in a project life cycle are most of the project expenses incurred. A. Concept phase
B Development of design phase
C. Execution phase.
D. Termination phase.
E. None of the above
第10题
● Feasibility studies occur in which life cycle phase (s)?
A Conceptual
B Conceptual or Development
C Execution
D Preliminary planning
E any life cycle phase
第11题
A Contract Phase
B Post-Award Phase
C Award Phase
D Pre-Award Phase
E Requirement Phase
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!