题目
A. Drop the affected tablespace, re-create the tablespace, restore the datafiles, and the tablespace.
B. Take the affected datafile offline (if not already offline), restore the damaged image of the datafile, and then bring it online.
C. Restart the database in MOUNT mode, restore the damaged datafile, recover the datafile and then open the database with resetlogs.
D. Put the database in RESTRICTED mode, restore all the datafiles in the affected datafile and recover the tablespace, and then put the database in normal operational mode.
第2题
A.Alfred’s network gateway will be compromised while the IDS is runnin
B.Alfred’s network may see a decrease in performance as a result of the IDS.
C.Alfred’s proxy server will not function correctly while the IDS is runnin
D.Alfred’s network may be easier to navigate as a result of the IDS implementation.
第3题
A.of inflation.
B.life is made too easy by modern miracle-performing appliances.
C.she’s spending too much time and energy to keep things runnin
D.her children will be leaving home soon.
第4题
塔库曼的团队建设理论认为,项目团队建设的生命周期中不包括()阶段。
A.形成(forming〉
B.磨合(running)
C.震荡(storming)
D.规范(norming)
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!