题目
试题(71)~(75)
A Bluetooth device can be either a master or a slave and any of the devices within a (71)can be the master. There is only one master and there can be up to (72) active slave devices at a time within a single network. In addition, a device may be a standby slave or a parked slave. There can be up to (73) parked slaves. If there are already maximum number of active slaves, then a parked slave must wait until one of the active slaves switches to (74) mode before it can become active. Within a network, all (75) communications are prohibited.
(71)
A. Wireless LAN
B. Wireless MAN
C. Cellular radio network
D. Piconet
(72)
A. 7
B. 15
C. 63
D. 255
(73)
A. 127
B. 255
C. 511
D. 1023
(74)
A. master
B. standby slave
C. parked slave
D. active slave
(75)
A. master-to-master
B. master-to-slave
C. slave-to-slave
D. slave-to-master
第1题
试题(71)~(75)Object-oriented analysis (OOA) is a semiformal specification technique for the object-oriented paradigm. Object-oriented analysis consists of three steps. The first step is (71). It determines how the various results are computed by the product and presents this information in the form. of a (72) and associated scenarios. The second is (73) , which determines the classes and their attributes. Then determine the interrelationships and interaction among the classes. The last step is (74) , which determines the actions performed by or to each class or subclass and presents this information in the form. of (75) .
(71)
A. use-case modeling
B. class modeling
C. dynamic modeling
D. behavioral modeling
(72)
A. collaboration diagram
B. sequence diagram
C. use-case diagram
D. activity diagram
(73)
A. use-case modeling
B. class modeling
C. dynamic modeling
D. behavioral modeling
(74)
A. use-case modeling
B. class modeling
C. dynamic modeling
D. behavioral modeling(75)
A. activity diagram
B. component diagram
C. sequence diagram
D. state diagram
第2题
【题目描述】
就上述内容。回答 71~75 小题的问题。
第 71 题 在对该土地进行评估时可采用的估价方法为()。
【我提交的答案】: ABD |
【参考答案与解析】: 正确答案:ABC |
【我的疑问】(如下,请求专家帮助解答)
请问为什么选剩余法不选收益还原法?
第3题
试题(71)~(75)
The software architecture is a set of software components, subsystems, relationships, interactions, the properties of each of these elements, and the set of guiding principles that together constitute the fundamental properties and constraints of a software system or set of systems. (71) defines a general set of element types and their interactions. The examples include Pipes and Filters, Model-View-Controller, and Reflection. A (72) in software architecture is a representation used to understand or document one or more aspects of a problem or solution. Architecture is usually used in conjunction with many adjunct terms. The (73) defines the key strategies, organization, goals and related processes of the enterprise. At the enterprise level, the (74) may be more of a set of guidelines on how the various software architectures should be constructed consistently across the enterprise. The (75), which describes the high-level set of elements involved in application from a particular domain along with their interactions, is often used to focus on subsystem definition rather than application process level definition.
(71)
A. Architectural pattern
B. Architectural description
C. Architectural view
D. Architectural viewpoint
(72)
A. model
B. domain
C. component
D. subsystem
(73)
A. enterprise architecture
B. technical architecture
C. infrastructure architecture
D. business architecture
(74)
A. enterprise architecture
B. data architecture
C. application architecture
D. information architecture
(75)
A. product-line architecture
B. reference architecture
C. technology architecture
D. infrastructure architecture
第4题
试题(71)~(75)
The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates ny current system,identifies (71) , and develops a concept for the new system. This phase as three steps: first, (72) is developed to guide the project team's efforts. It usually ncludes an analysis of the current system and its problems, and the ways to design a new ystem. The next step is (73) The analysis ofthis information - in conjunction withinput rom the project sponsor and many other people - leads to the development of a concept for a ew system. The system concept is then used as a basis to develop a set ofbusiness analysis odels that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the (74) necessary to support the nderlying business process. Last, the analyses, system concepts, and models are combined nto a document called the (75), which is presented to the project sponsor and other key ecision makers that decide whether the project should continue to move forward.
(71) A. improvementopportunities
B. logicalmodel
C. systemrequirements
D. systemarchitecture
(72) A. a user manual
B. an analysis strategy
C. an analysis use case
D. a design user case
(73) A. project scope definition
B. prob,lems analysis
C. decisionanalysis
D. requirementsgathering
(74) A. dataandprocesses
B. systeminfrastructures
C. externalagents
D. systemsoftware
(75) A. requirementsstatement
B. designspecification
C. systemproposal
D. project charter
第6题
试题(71)
Which of the following would require real-time processing?(71)
(71)
A.Playing a computer game
B.Executing a program that predicts the state of economy
C.Printing labels
D.Listening the music
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!