● The critical path in a schedule network is the path that:
A Takes the longest time to complete
B Must be done before any other tasks
C Allows some flexibility in scheduling a start time.
D Is not affected by schedule slippage
E All of the above.
第1题
170 A non-critical path activity is completed in half the time. Then,
A. The critical path is also reduced.
B. The slack in the path containing this activity will increase.
C. The total cost for this activity has decreased.
D. Manpower from this activity can be assigned to other activities.
E. All of the above.
第3题
The critical path in a schedule network is the path that:
A.Takes the longest time to complete
B.Must be done before any other tasks
C.Allows some flexibility in scheduling a start time.
D.Is not affected by schedule slippage
E.All of the above.
第4题
● Your team has prepared a CPM schedule for your review. You notice that one node has six inputs (including two dummy activities) and four outputs (which include one dummy activity). Select the correct statement from the following:
A This is a valid representation if the logic is correct.
B This is invalid because a node can have a maximum of one dummy input representation if the logic is correct.
C This is invalid because nodes cannot have both dummy inputs and dummy outputs.
D This is a invalid because the number of outputs must equal the number of inputs.
E This is invalid because a maximum of two inputs and two outputs are allowed using the critical path method.
第5题
● Using the figure in the Special window, The Critical path is _____ weeks.
A 21
B 22
C 23
D 24
E 25
第6题
Using the figure in the Special window, The critical path is:
A . A-B-G
B . C-G
C . C-D
D . E-F
E . A-B-G and C-D
第7题
Using the figure in the Special window, The Critical path is _____ weeks.
A . 21
B . 22
C . 23
D . 24
E . 25
第8题
A.16days
B.14days
C.19days
D.20days
第9题
In project network diagram,the number of critical path is().
A.none
B.only one
C.only two
D.one or more
第10题
146 The critical path in a network is the path that:
A. Has the greatest degree of risk.
B. Will elongate the project if the activities on this path take longer than anticipated.
C. Must be completed before all other paths.
D. All of the above.
E. A and B only