Cost and schedule data are usually integrated because:A.optimized project cash flow can af

Cost and schedule data are usually integrated because:

A.optimized project cash flow can affect financial requirements

B.they provide MIS with an integrated system to produce reports

C.they control escalation allowances

D.they account for omissions in the definitive estimate

E.they predict future performance

查看参考答案
更多“Cost and schedule data are usually integrated because:A.optimized project cash flow can af”相关的问题

第1题

What is the relative priority of project Cost, Schedule and Quality?A.1)Cost - 2)Schedule

What is the relative priority of project Cost, Schedule and Quality?

A . 1)Cost - 2)Schedule - 3)Quality

B . 1)Quality - 2)Schedule - 3)Cost

C . 1)Quality - 2)Cost - 3)Schedule

D . 1)Schedule - 2)Quality - 3)Cost

E . All are of equal priority

点击查看答案

第2题

If I know the variable cost schedule, I can derive the marginal cost schedule with no further information.()
点击查看答案

第3题

12What is the relative priority of project Cost, Schedule and Quality? A.1)Cost - 2)Schedu

12 What is the relative priority of project Cost, Schedule and Quality?

A. 1)Cost - 2)Schedule - 3)Quality

B. 1)Quality - 2)Schedule - 3)Cost

C. 1)Quality - 2)Cost - 3)Schedule

D. 1)Schedule - 2)Quality - 3)Cost

E. All are of equal priority

点击查看答案

第4题

The Work Breakdown Structure (WBS) is the basis for communicating:A.Project scope, cost co

The Work Breakdown Structure (WBS) is the basis for communicating:

A.Project scope, cost control, schedule, quality

B.Project objectives, dependencies, plan, cost control

C.Project scope, schedule, staffing, cost control

D.Project scope, quality, schedule, dependencies

E.Project budget, schedule, risk factors, work assignments.

点击查看答案

第5题

Estimating schedule activity costs involves developing an (74) of the cost of the resource

Estimating schedule activity costs involves developing an (74) of the cost of the resources needed to complete each schedule activity.

A.accuracy

B.approximation

C.specification

D.summary

点击查看答案

第6题

A negative cost variance and positive schedule variance means:AThe project is under budget

A negative cost variance and positive schedule variance means:

A The project is under budget and ahead of schedule

B The project is over budget and behind schedule

C The project is over budget and ahead of schedule

D The project will be overrun but ahead of schedule at completion

点击查看答案

第7题

●Project trade-offs vary betweenArisk, cost and schedule.Bdirect cost, indirect cost, and

● Project trade-offs vary between

A risk, cost and schedule.

B direct cost, indirect cost, and resource availability

C quality, schedule and time

D cost, quality and schedule

E contract terms, scope and budget

点击查看答案

第8题

57Which of the following are types of status reports? A.document, variance, trend and exce

57 Which of the following are types of status reports?

A. document, variance, trend and exception

B. cost, trend, schedule and acquisition

C. cost, schedule, technical performance

D. analysis, cost, performance and schedule

E. All of the above.

点击查看答案

第9题

Project trade-offs vary betweenA.risk, cost and schedule.B.direct cost, indirect cost, and

Project trade-offs vary between

A . risk, cost and schedule.

B . direct cost, indirect cost, and resource availability

C . quality, schedule and time

D . cost, quality and schedule

E . contract terms, scope and budget

点击查看答案

第10题

2The Work Breakdown Structure (WBS) is the basis for communicating: A.Project scope, cost

2 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments

点击查看答案
赏学吧APP
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)
订单号:
遇到问题请联系在线客服
请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注赏学吧 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注赏学吧 -
请用微信扫码测试
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
赏学吧